Development Project Examples

Three locations in Norway. Real Estate with Bifrost Edge Power & Land Access

At Bifrost EDGE we find the real estate, secure land & power, site enable to shovel ready, develop/construct, build optimised AI Data Centers and as your operator. These examples show we are able to meet your capacity and operational requirements “Lets Talk Fulfilment”.

Site “LA”: Hyperscale Flagship

  • Phase 1. 250+MW Base case for RFS around mid-2029, with a positive path to an additional tranche in 2H 2028.
  • Phase 2. Total site power >500MW

Site “VT”: Fast-Track Infrastructure

  • Phase 1. 40MW Grid access December 2026
  • Phase 2. ~100MW Q2 2027
  • Phase 3. Total site power ~150MW.

Site “KV”: Scalable Energy Options

  • Phase 1. 74MW of grid power.
  • Phase 2. Total site power ~650MW